Built to fit the frame: a custom crossflow booth for Armcor
An 8 m forklift side door, extra roof height and full AS/NZS 4114:2020 compliance, delivered on a tight program for Armcor’s new facility.
About Armcor
Armcor Air Solutions is a Victorian-headquartered designer and manufacturer of commercial air-conditioning equipment, built around one idea: ‘Fresh air in every building’. Its range covers air handling units (AHUs), with a factory-assembled standard range from 500 to 25,000 l/s, along with energy recovery ventilation (ERV), ERV packaged air conditioning and dehumidification equipment. A wholly owned subsidiary of Sweden’s Beijer Ref, Armcor supplies consultants and contractors on government, industrial, retail, commercial and institutional projects ‘from Darwin to Devonport and Bangkok to Bathurst’.
The Challenge
Armcor’s AHU structural frames are big. Depending on their size, they are moved around the factory on wheeled skids or by forklift. Any new spray booth had to take those frames the way Armcor already handles them, not the other way around.
That set a clear brief. The booth needed to be large enough to fit Armcor’s biggest frames, with a very large side opening so a forklift could bring a frame straight in. It also needed a front entry for the smaller frames and parts that need painting. This was a job for a custom booth, not a catalogue model.
The Solution
Truflow designed and built a custom crossflow spray booth around Armcor’s products and the way its team works. In a crossflow booth, air is drawn horizontally through the booth, from intake filters at one end to exhaust filters at the other.
- 8 m side entry door. A forklift can carry large AHU frames into the booth through the side.
- Front entry. A second way in for smaller frames and parts.
- Extra roof height. Added headroom to accommodate Armcor’s large structural frames.
- Full compliance with AS/NZS 4114:2020. Built to the joint Australian and New Zealand Standard, Spray painting booths, designated spray painting areas and paint mixing rooms.
At a Glance
Client: Armcor Air Solutions
Industry: HVAC: air handling unit design and manufacturing
Location: Broadmeadows, Victoria
Solution: Custom crossflow spray booth
Key features:
- 8 m side entry door for forklift loading
- Front entry for smaller frames and parts
- Extra roof height
- AS/NZS 4114:2020 compliant
- Delivered: On a tight time frame for Armcor’s new 2026 facility
Compliance built in
AS/NZS 4114:2020 sets requirements for the design, construction, installation, testing and maintenance of spray painting booths, covering areas such as ventilation, airflow monitoring, electrical equipment, doors and emergency exits. An 8 m opening in the side of a crossflow booth is not a standard detail. Truflow engineered the booth to accommodate it while meeting the Standard in full.
Delivery: a unique booth on a tight program
For Truflow’s engineering team, this was an interesting installation: a booth shaped by the size of the product and the way it moves through the factory. For the operations team, it came with a short time frame. Armcor was moving into its new Broadmeadows facility in 2026 and was eager to get production going there.
Truflow’s engineering and operations teams worked together to design, build and install the booth to suit that program, so Armcor could start painting in its new facility.
A partnership built on trust
Truflow and Armcor have worked together for many years, and the relationship runs both ways. Armcor supplies unique temperature control systems that support Truflow’s custom temperature-controlled spray booths. They are especially important in difficult climate zones such as the Northern Territory, where cooling and dehumidification are regular requirements on spray booth systems.
So when Armcor needed a spray booth of its own, choosing Truflow was an easy decision. The two businesses had already built a relationship on trust, and Armcor knew Truflow could support a difficult time frame. Today Armcor is both a supplier to Truflow and a Truflow customer.
“Thank you to the Armcor team for choosing Truflow and for being a great company to work with both as a supplier and customer.”
Chris Spencer | Group General Manager, Truflow Spray Booths
Need a booth built for the job?
Large or awkward parts, unusual access, or a climate that calls for cooling and dehumidification: Truflow designs, manufactures and installs custom spray booths Australia-wide. Talk to our team about your next project.
Phone: 1300 266 847
Email: info@truflowspraybooths.com.au
Web: truflowspraybooths.com.au
Head Office: 25-27 Futura Road, Keysborough VIC 3173